Tutorial Plans

Set up a plan: rename it and set options

The pencil icon next to a plan opens its settings. Enter a plan name and confirm with the green check mark; the trash icon deletes the plan together with all captured data.

Two options are available per plan. “Render this plan as bitmap” converts very large or complex PDF plans into an image internally so the iPad can display them without errors – the plan then looks blurred when you zoom in closely. “Export plan preview as report cover sheet” adds a cover sheet with a plan preview and the position of all captured data to the exported report; it takes effect from the next export once the plan has been saved.

  1. Rename a plan: tap the pencil icon to the right of the plan.
    Rename a plan: tap the pencil icon to the right of the plan.
  2. Enter the plan name in the text field, then close the keyboard.
    Enter the plan name in the text field, then close the keyboard.
  3. To confirm, tap the green check mark. To exit without saving, tap the red X. To delete the plan including its content (!), tap the trash icon.
    To confirm, tap the green check mark. To exit without saving, tap the red X. To delete the plan including its content (!), tap the trash icon.
  4. Render plan as bitmap: very complex or very large PDF plans with lots of hatching, lines and symbols can overwhelm the iPad and cause display errors.
    Render plan as bitmap: very complex or very large PDF plans with lots of hatching, lines and symbols can overwhelm the iPad and cause display errors.
  5. To still work with such a plan, Plaans can convert the PDF into an image internally. Activate “Render this plan as bitmap”.
    To still work with such a plan, Plaans can convert the PDF into an image internally. Activate “Render this plan as bitmap”.
  6. Because the plan is now pixel-based, it looks blurred when you zoom in.
    Because the plan is now pixel-based, it looks blurred when you zoom in.
  7. Report cover sheet: you can add a cover sheet with a plan preview, showing where the plan data is located, to the exported report.
    Report cover sheet: you can add a cover sheet with a plan preview, showing where the plan data is located, to the exported report.
  8. Tap the pencil icon to the right of the plan.
    Tap the pencil icon to the right of the plan.
  9. Activate “Export plan preview as report cover sheet” and close the keyboard.
    Activate “Export plan preview as report cover sheet” and close the keyboard.
  10. Tap the green check mark to confirm. To activate the cover sheet, the plan must be saved once before exporting the report (!).
    Tap the green check mark to confirm. To activate the cover sheet, the plan must be saved once before exporting the report (!).
  11. Tap “Open plan”.
    Tap “Open plan”.
  12. To save the plan, tap the green check mark in the top left corner.
    To save the plan, tap the green check mark in the top left corner.
  13. The cover sheet is now included in the next plan or project export.
    The cover sheet is now included in the next plan or project export.